ST8 Wide Electrical was contracted by Kotzur to install, wire and commission the electrical on 10 x 450TPH drive over grids (DOG’s). This project was conducted on a tight schedule to meet harvest season.

Previous
Previous

BeneTerra Waste water Evap

Next
Next

Vegetable processing factory