Call Now
0428 971 253

Enquiries - This email address is being protected from spambots. You need JavaScript enabled to view it.This email address is being protected from spambots. You need JavaScript enabled to view it.
Toowoomba Electricans

Temporary Power Pole Hire

 

Thank you for your enquiry, ST8 Wide Electrical can supply Temporary Power Poles to sites in the Toowoomba and surrounding areas. The services that can be provided include the submition of the Form 2 to the network provider, DBYD, delivery, install, testing and removal of the pole.

Rental Fee: $45.00 + GST per week (enquire about a more competative rate for rental periods longer than 6 months)
Testing & Form 2: $85.00 + GST (includes site visit for test and form 2 submission)
Install Fee: $465.00+ GST (includes delivery, dig hole, install, DBYD, testing & form 2)
Removal Fee: $180.00 + GST (removal and return of pole. NOTE: owner/builder must arrange power disconnect prior to removal)
Install & Removal: $600.00 + GST (discount only provided when install and removal is ordered at the start of the hire agreement)

At the time of ordering your temporary power pole we will require the following:

  • The full address of the property including Lot number and RP/SP numbers.
  • The electricity retailer of your choice (Origin, AGL, Ergon, Power Direct etc).
  • The name and contact details of the electricity account holder including ABN if a company.

Note: Lead time for connection is up to 10 business days, however if the service provider advises that traffic control or tree trimming etc is required then further delays may occur.

Please consider
ST8 Wide Electrical for all your
residential, commercial and
industrial electrical requirements.

Builders Responsibilities:

Selection of a suitable pole position.

If you are digging the hole - 200mm minimum diameter and 250mm maximum diameter, 1300mm minimum depth and 1500mm maximum depth.

Complete a Dial Before You Dig to ensure there are no cables or pipes.

There is a 3 meter distance from the closest obstruction to allow for the stabliser legs. (All equipment must be in the property boundary).

There is no obstruction to the cable that will be swung from the closest power pole to the temporary power pole.

Ensure the cable will not cross neighbouring properties.

Maximum distance from street supply to temproary pole is 20 meters.

 
101 Taylor St, Toowoomba Q 4350
Mobile: 0428 971 253
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
www.st8wideelectrical.com.au